<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>climate change &#8211; European Rail Campaign (UK)</title>
	<atom:link href="https://www.eurorailcampaignuk.org/category/uncategorized/climate-change/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.eurorailcampaignuk.org</link>
	<description>The Campaign for Better Rail Links to and from the UK and across Europe</description>
	<lastBuildDate>Mon, 06 Apr 2026 11:59:43 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://www.eurorailcampaignuk.org/wp-content/uploads/2024/11/cropped-ERC-Logo-6--32x32.png</url>
	<title>climate change &#8211; European Rail Campaign (UK)</title>
	<link>https://www.eurorailcampaignuk.org</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>SWISS RAILWAYS ARE BETTER THAN EVER</title>
		<link>https://www.eurorailcampaignuk.org/swiss-railways-are-better-than-ever/</link>
					<comments>https://www.eurorailcampaignuk.org/swiss-railways-are-better-than-ever/#respond</comments>
		
		<dc:creator><![CDATA[Nigel Perkins]]></dc:creator>
		<pubDate>Mon, 06 Apr 2026 11:59:42 +0000</pubDate>
				<category><![CDATA[climate change]]></category>
		<category><![CDATA[Uncategorized]]></category>
		<category><![CDATA[rail]]></category>
		<category><![CDATA[train]]></category>
		<guid isPermaLink="false">https://www.eurorailcampaignuk.org/?p=3272</guid>

					<description><![CDATA[While the cost of diesel fuel goes up and up each week due to the war in the Gulf, the UK still has less than 50% of its rail network electrified. Hopefully, Rail will be prioritised as an essential service if diesel fuel has to be rationed in the near future.UK Government policy seems to be &#8220;Anything but Electrification&#8221; in recent years. All we seem to hear is talk about battery trains, hydrogen trains and &#8220;Discontinuous Electrification&#8221;. This in stark contrast to the Swiss who now have a virtually 100% electric railway powered from mainly renewable sources which are not affected by the Gulf War. While train fares and much else are not that cheap in Switzerland the service is]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">While the cost of diesel fuel goes up and up each week due to the war in the Gulf, the UK still has less than 50% of its rail network electrified. Hopefully, Rail will be prioritised as an essential service if diesel fuel has to be rationed in the near future.UK Government policy seems to be &#8220;Anything but Electrification&#8221; in recent years. All we seem to hear is talk about battery trains, hydrogen trains and &#8220;Discontinuous Electrification&#8221;.</p>



<p class="wp-block-paragraph">This in stark contrast to the Swiss who now have a virtually 100% electric railway powered from mainly renewable sources which are not affected by the Gulf War. While train fares and much else are not that cheap in Switzerland the service is so frequent and reliable that they broke their punctuality records last year in 2025.</p>



<p class="wp-block-paragraph">See here for a link to a recent report in the Swiss Media; <a href="https://lenews.ch/2026/01/28/swiss-railways-set-a-new-punctuality-record/" data-type="link" data-id="https://lenews.ch/2026/01/28/swiss-railways-set-a-new-punctuality-record/">https://lenews.ch/2026/01/28/swiss-railways-set-a-new-punctuality-record/</a></p>



<p class="wp-block-paragraph"><img fetchpriority="high" decoding="async" width="600" height="400" src="https://i0.wp.com/lenews.ch/wp-content/uploads/2026/01/Zugstaufe_011223_007.jpg?resize=600%2C400&amp;ssl=1" alt=""><em>© CFF/SBB</em></p>



<p class="wp-block-paragraph"></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.eurorailcampaignuk.org/swiss-railways-are-better-than-ever/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>CLIMATE CHANGE HITS 3 KEY EUROPEAN RAIL ARTERIES</title>
		<link>https://www.eurorailcampaignuk.org/climate-change-hits-3-key-european-rail-arteries/</link>
					<comments>https://www.eurorailcampaignuk.org/climate-change-hits-3-key-european-rail-arteries/#respond</comments>
		
		<dc:creator><![CDATA[Nigel Perkins]]></dc:creator>
		<pubDate>Mon, 16 Oct 2023 22:33:45 +0000</pubDate>
				<category><![CDATA[climate change]]></category>
		<category><![CDATA[Cross Border links]]></category>
		<category><![CDATA[rail]]></category>
		<category><![CDATA[storm]]></category>
		<category><![CDATA[transalpine]]></category>
		<guid isPermaLink="false">https://www.eurorailcampaignuk.org/?p=2382</guid>

					<description><![CDATA[At a time when we need to use our European Rail Network more than ever, 3 separate extreme weather events blocked 3 important rail routes during August and September. (1) On the 7th of August during &#8220;Storm Hans&#8221;, extreme rainfall and flooding caused the collapse of a bridge near Lillehammer on the main trunk line serving Northern Norway between Oslo and Trondheim. It will take a minimum of 3 months to restore any kind of service. There is only one alternative slower route with limited capacity. (2) On the 27th of August there was a very large rockfall near Modane which blocked the key Transalpine link between France and Italy. It is estimated that it will take a minimum of]]></description>
										<content:encoded><![CDATA[
<p class="has-medium-font-size wp-block-paragraph">At a time when we need to use our European Rail Network more than ever, 3 separate extreme weather events blocked 3 important rail routes during August and September.</p>



<p class="has-medium-font-size wp-block-paragraph">(1) On the 7th of August during &#8220;Storm Hans&#8221;, extreme rainfall and flooding caused the collapse of a bridge near Lillehammer on the main trunk line serving Northern Norway between Oslo and Trondheim. It will take a minimum of 3 months to restore any kind of service. There is only one alternative slower route with limited capacity.</p>



<p class="has-medium-font-size wp-block-paragraph">(2) On the 27th of August there was a very large rockfall near Modane which blocked the key Transalpine link between France and Italy. It is estimated that it will take a minimum of 3-4 months to restore any kind of service. There is no real alternative route except for very lengthy and congested detours via Switzerland or the French &amp; Italian Rivieras. This was made worse with the Simplon tunnel closed for engineering work until the 10th of September, and the Gotthard tunnel being only partially open since the 10th August due to a freight train derailment.</p>



<p class="has-medium-font-size wp-block-paragraph">(3) On the 8th of September &#8220;Storm Daniel&#8221; in Greece damaged and/or flooded around 60 kilometres of the main Athens-Thessaloniki trunk line. At present, there is no estimate as to when services can be restored. This is the one and only double track electrified main line linking the 2 largest cities in Greece.</p>



<p class="wp-block-paragraph"></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.eurorailcampaignuk.org/climate-change-hits-3-key-european-rail-arteries/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
